====== Telecon 20180214 ====== Attending: Brian, Amy, Roger, Al, Kris, Julian, Jacques, Karl, Qi Notes by : Qi \\ === Agenda=== * 2.5 day Workshop: May 1,2,3; in Minneapolis. * Telescope and instrument I+T (Tomo, Bill J) * {{::telescopei_t_v002_20171212_s.pdf|Telescope I+T}} (Tomo) * {{::plancki_t_jones_20171212.pdf|Receiver, Bill Jones}} * [[https://zzz.physics.umn.edu/ipsig/_media/systematicswg/telecons/2018-02-14/pointing.pdf|Attitude control requirements (Jacques)]] * Images from Kris * | {{::m000.png?100|m000.png}} | {{::m000ge.png?100|m000ge.png}} | {{::m000gm.png?100|m000gm.png}} | * Focal Plane updates (Karl) {{::focalplane_update_20180214.pdf|Focal plane slides}} === Notes === * Workshop * Working on program, plan to release in next few days * about: science, report, white paper if there is, data complement other data sets * Spacecraft (Amy) * we will need space craft bus, everything around the instrument * biggest challenge is point the instrument, spinning ,precession * mission TeamX * orbit (shape, size of orbit, sun & moon), ground processing * industry parter, preliminary design; * requirement for the craft, pointing stability & accuracy, mass, power we need * a week after TeamX * Attitude control requirements (Jacques) * sampling requirement * For CORE, 1/4th, constrained by scan strategy * for each position on the sky, we want to compare compare data, important for systematics * The requirement of sampling will translate to the requirement of altitude * Uncertainty on the position of spin axis, from one scan to other, translated to difference between two scans. * good control helps reduce gaps as much as we can * * Cross-scan sampling per precession * Currently, T_prec = 10 hours, T_spin = 1 min, which lead to theta = 3' * 3' is good for 100 GHz, but not above; we can change T_spin or T_precession * Kris does not think changing T_precession / T_ spin can solve the problem globally. Very long precession, penalty is pile up enormously at poles. * we are assuming engineering achieving nominal, by 1 arcmin in 3 sigma error per spin. * Point reconstruction * alignment of instrument FOV with reference of spacecraft. change should not be faster than calibration * Jacques: we need to do simulation to get final number for point reconstruction * Shaul: 1’’ will be driven by systematics. We will see if 1’’ is reasonable given r value. * Amy: too loose, worse systematics; too tight, expensive to engineering.