====== Telecon 20180620 ====== Attending: Jamie, Brian, Tom, Shaul, Qi Notes by : Qi === Agenda === * {{::20180620_focalplane_mechanicaldesign.pdf|Mechanical design of focal plane }}(Qi) * 2-year, 4 detector, simulated maps available - next steps? (Kris) * {{::picoreport.pdf|Report Writing }} * Remaining key open areas: **Thermal Design (JPL)**; Changing telecons to a lower cadence: two weeks? === Notes === Mechanical design of focal plane * Jamie shared the experience with Bicep3 focal plane: * heat sink: gold frames and wires around perimeter of wafer. They found contact resistance is the main issue. Biggest thermal impedance comes from between gold and silicon; at 100mK, conductance is mainly through electrons, pushing harder does not help. * 4 clamps push down the wafers, but wafers can still slide; clamps don't short the instruments. * In theory, gold wires and bars play the role of RF shields. * PICO has a preliminary design, which can be used to estimate the mass already; more details about how to mount wafers on frames are ongoing * material of frame: copper vs invar? Jamie: invar has high capacity, large mount of magnetic material * bump bonds should be straightforward on PICO time scale * Karl knows the size of TDM, **Qi to find out what Karl has concluded (AI)** Report writing * page 4, section 3 Instrument is most relevant * internal review * by the end of August Thermal design * we don't have one yet, JPL is responsible. **No objection against changing the telecon cadence to 2 weeks.**