====== Telecon Notes 20180103 ====== Attendance: Notes by: \\ === Agenda:=== * TeamX: this one is TeamX-Instrument. There is a second one in March, and also a 'Mission' one in March. * Our goals * are there any yet unidentified challenges? * give initial cost estimate? Our framework was ~$175M * Note: JPL insists on 30% cost margin; NASA guidelines are 25%. * Engineering Exercise * 3 hours/day, Dec. 19-21 total of 9 hours. * ~10 engineers (optics, mechanical, system engineering, cost, electronics, cooling, detectors) * Results * Awaiting final results by mid-January. All other comments are preliminary. * No major challenges / show stoppers identified; design is sound. * Cost is close to our framework under specific assumptions for the cooling. * AAS Presentations (next week): one oral + two posters * Co-Author Policy: all EC + Science Group Leaders + Others (nominations + self nominations) * {{:private:aasoral2018_v1.pdf|Rough (pre-first) Draft Oral in Special Session}} * {{:private:pico_science_aas_v3_sh.pdf|Science Poster (Qi Wen, work in progress)}} * {{:private:pico_optics_aas2018_20171227_sh.pdf|Optics and Noise (Karl Young, reasonably mature}}