====== Telecon Notes June 20, 2018 ====== Attendance: Shaul, Al, Jamie, Bill J. Notes by: Shaul === Agenda === * Review of TeamX slides * Instrument: * summary * systems * **cost** * **optics** * Mechanical/Configuration * **Focal Planes and Detectors** * //Thermal// * Mission: * summary * systems * instruments * **cost** * **mission design** * ACS * Power * Configuration * Mechanical * Propulsion * Thermal * CDS (computer and data system?) * **SVIT (System Verification Integration and Testing?)** * Telecom * Ground Systems * Report writing * schedule * First draft by Sept. 1 (first round of text + key figures) * October 1: 2nd draft * October 30: 3rd semi-final draft * Nov. 1: submit to external review * Nov. 21: receive external review comments * Nov. 21- Dec 15: implement external review changes * Dec. 15-31: final review * Dec. 31, 2018 - Submit * platform: GitHub * {{:private:picoreport.pdf|assignments + review of status}} === Notes === * TeamX Slides: * Shaul suggests that subset of EC will review the TeamX slides. The goal is to fix and flag issue that may jump out for SOMA. * Are TeamX slides going to the decadal panel? Shaul thinks not, but the decadal can request them. * Jamie, Al suggest to add 'heritage' slides to the TeamX slides to increase SOMA's confidence * Bill will review the SVIT slides; Al, Jamie, Shaul will review the entire set * We will review comments by next week * Report: * Two different audiences: the cost estimators and the decadal panel. Balance is difficult. * Shaul suggested using additional narrative together TeamX slides to add material for SOMA. * Galactic science 5 pages is too long; Al, Jamie suggest to reduce to 3, and augment the 'mission' page allocation.