cool the whole thing down, long run
Because of TES, optical loading, to see Psat
If we convince ourselves that we can do Polarimetric calibration ● Spectroscopic calibration on the whole system, we should
Shaul: depending on the size of chamber
Bill: do the math, and believe device level testings
Planck was lucky, given the limited time of fully integration testing.
Shaul: polarization modulation efficiency, one would calculate well based on the testings without mirrors.
Bill: angular calibration, independent may be demanding.
constrained bandpass mismatch, using data itself. It’s a big question to reach r<10^-4.
2 month is the tight. sort of Planck schedule. better to add 1 month to do testing, not sure the cost.
in flight correction of HFI, the challenge is it’s difficult to do spectroscopy tests on the whole, which are in fact dependent on the whole system.