Optimizing Scan Strategy

A/I : Shaul to make table of physical constraints on scan parameters (alpha, beta, precession and spin rates, L2 orbit radius, sampling rate)

Parameter Value notes
L2 orbit radius ? what do we need
alpha (Precession angle) 30 (need to finalize with JPL)
beta (boresight to spin angle) 65 (need to finalize with JPL)
Precession period 10 hours
spin period 1 minute
HWP period n/a
Detector sample rate 1 ms
Noise 1/f 10 mHz check with sys group
Noise power index 1 check with sys group

A/I: Jacques to make table of metrics and properties by which to evaluate scan options: available here