Telecon Notes 20180103
Attendance:
Notes by:
Agenda:
TeamX: this one is TeamX-Instrument. There is a second one in March, and also a 'Mission' one in March.
Our goals
are there any yet unidentified challenges?
give initial cost estimate? Our framework was ~$175M
Note: JPL insists on 30% cost margin; NASA guidelines are 25%.
Engineering Exercise
3 hours/day, Dec. 19-21 total of 9 hours.
~10 engineers (optics, mechanical, system engineering, cost, electronics, cooling, detectors)
Results
Awaiting final results by mid-January. All other comments are preliminary.
No major challenges / show stoppers identified; design is sound.
Cost is close to our framework under specific assumptions for the cooling.
AAS Presentations (next week): one oral + two posters
Co-Author Policy: all EC + Science Group Leaders + Others (nominations + self nominations)
Rough (pre-first) Draft Oral in Special Session
Science Poster (Qi Wen, work in progress)
Optics and Noise (Karl Young, reasonably mature