Go to the U of M home page
School of Physics & Astronomy
Probe Mission Study Wiki

User Tools


foregroundstelecon20180329

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
foregroundstelecon20180329 [2018/03/29 15:55] – created hananyforegroundstelecon20180329 [2018/04/04 10:42] (current) hanany
Line 12: Line 12:
  
   * Maps:    * Maps: 
-    * Action: Clem is proceeding to make maps parallel to those that have been made for S4 +    * **Action: Clem is proceeding to make maps parallel to those that have been made for S4** 
-    * Action: Clem will include the MHD maps from Brandon  +    * **Action: Clem will include the MHD maps from Brandon**  
-    * Clem asks: include fake delensing? Make 1000 simulations? provide all components? with r or without r? Answers, after some discussion: yes, include delensing. (Action: Shaul will check with Raphael what level of delensing to assume?+    * Clem asks: include fake delensing? Make 1000 simulations? provide all components? with r or without r? Answers, after some discussion: 
 +      * yes, include delensing. **Action: Shaul will check with Raphael what level of delensing to assume?**;  
 +      * 50% simulations with r=0; 50% with r=?? 
 +      * yes, provide analyzers all components 
 +   * Discussion on the limitations of running Commander1 which 'is limited' to \ell=50. Charles explains that Commander is not limited to \ell=50, the restriction is computing resources. Also Commander1 has a fixed resolution at all frequencies, which happens to be the lowest resolution corresponding to the lowest frequency. Commander2 can do the analysis with varying resolution. **Action: Charles will check with Hans Kristian Erikson on the status of running commander2.** 
 +  * Mathieu reports on his results using the delensing factor of CORE (60%).  
 +    *  [[https://www.dropbox.com/s/u0duax1l3jqd7dj/Remazeilles_commander_pico4_addendum.pdf?dl=0|Here are the slides]] 
 +    * \sigma - r is reduced from 3.5e-4 to ~2e-4; see slides.  
 +  * Brief discussion of workshop plan. It would be good to have a discussion of the steps necessary to move forward. **Action: Shaul will try to include in the agenda.**
foregroundstelecon20180329.1522356946.txt.gz · Last modified: 2018/03/29 15:55 by hanany