Campuses:
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
foregroundstelecon20210826 [2021/09/08 20:40] – created hanany | foregroundstelecon20210826 [2021/09/08 20:47] (current) – hanany | ||
---|---|---|---|
Line 14: | Line 14: | ||
DELENSING PLAN | DELENSING PLAN | ||
- | 1) get simulated maps at proper nside (2048), with PICO optical beam and noise. No point sources: Two options: PySM or PSM. To be discussed with Clem. | + | |
- | | + | - get simulated maps at proper nside (2048), with PICO optical beam and noise. No point sources: Two options: PySM or PSM. To be discussed with Clem. |
- | | + | |
- | | + | |
+ | | ||
+ | |||
+ | WORK ON COMPSEP | ||
+ | |||
+ | Commander: Ragnhild working on debugging. | ||
+ | |||
+ | NILC: Mathieu gave an update of the GNILC pipeline on 5 models: (91, 92 93, 96, 98); Draft on overleaf filled with figures from Mathieu (figures for model 98 still to be added). Satisfactory component separation for all models except 98. Low and high frequency channels are useful. | ||
+ | |||
+ | Q. Does the delensing go in the paper currently being drafted? A separate section at nside=2048 could be included. | ||