Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| foregroundstelecon20210826 [2021/09/08 20:40] – hanany | foregroundstelecon20210826 [2021/09/08 20:47] (current) – hanany | ||
|---|---|---|---|
| Line 15: | Line 15: | ||
| DELENSING PLAN | DELENSING PLAN | ||
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| + | |||
| + | WORK ON COMPSEP | ||
| + | |||
| + | Commander: Ragnhild working on debugging. | ||
| + | |||
| + | NILC: Mathieu gave an update of the GNILC pipeline on 5 models: (91, 92 93, 96, 98); Draft on overleaf filled with figures from Mathieu (figures for model 98 still to be added). Satisfactory component separation for all models except 98. Low and high frequency channels are useful. | ||
| + | |||
| + | Q. Does the delensing go in the paper currently being drafted? A separate section at nside=2048 could be included. | ||