 ====== Action Items and Status ====== ====== Action Items and Status ======
  
 +  * UMN to develop focal plane loading model including load from mirror(s) and cold stop as a function of temperature
 +    * Ongoing
 +  * JPL to develop scaling of cooling cost depending on what mass we cool to which temperature
 +  * Need input on feasibility and cost model of deployable shields
 +  * Roger to work on ASIC solutions to TDM, FDM
 +    * discuss with Matt
 +    * do wiring load trade-off between the two options
 +  * <del>UMN, investigate DLFOV trade-off between crossed and open dragone</del> Largely complete. 
 +  * Amy, determine cost difference for larger mirrors
 +  * <del>Brad, determine sidelobe analysis done for EPIC.  How was galaxy contamination accounted for.</del>
 +  * Amy, begin a matrix of possible science outputs.
 +    * First version sent to Shaul
   * <del>Brad will revisit EPIC-IM sidelobe analysis, will report next week on what is required to fire up the analysis for CMBP.</del> Answer: can repeat the analysis. Not clear that we need right now.    * <del>Brad will revisit EPIC-IM sidelobe analysis, will report next week on what is required to fire up the analysis for CMBP.</del> Answer: can repeat the analysis. Not clear that we need right now. 
   * UMN follow up on coma corrections for the Dragone telescope   * UMN follow up on coma corrections for the Dragone telescope