Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
imagerteleconnotes20171114 [2017/11/15 17:11] – wenxx181 | imagerteleconnotes20171114 [2017/11/21 10:03] (current) – hanany | ||
---|---|---|---|
Line 26: | Line 26: | ||
* None of this has been optimized for power use. ASICs have not been included. | * None of this has been optimized for power use. ASICs have not been included. | ||
* FDM has thought about this somewhat, **Shaul** to pull out numbers from LiteBIRD assumptions | * FDM has thought about this somewhat, **Shaul** to pull out numbers from LiteBIRD assumptions | ||
- | * TDM, **Roger** will work on TDM estimates. | + | * TDM, **Roger** will work on TDM estimates. |
* 3rd option: microwave mux, in demo stage on MUSTANG. | * 3rd option: microwave mux, in demo stage on MUSTANG. | ||