* Attitude control requirements (Jacques) | * Attitude control requirements (Jacques) | ||
* sampling requirement | * sampling requirement | ||
- | * For CORE, 1/4th, constrained by scan strategy | + | * For CORE, 1/4th, constrained by scan strategy |
* for each position on the sky, we want to compare compare data, important for systematics | * for each position on the sky, we want to compare compare data, important for systematics | ||
* The requirement of sampling will translate to the requirement of altitude | * The requirement of sampling will translate to the requirement of altitude | ||
* Uncertainty on the position of spin axis, from one scan to other, translated to difference between two scans. | * Uncertainty on the position of spin axis, from one scan to other, translated to difference between two scans. | ||
* good control helps reduce gaps as much as we can | * good control helps reduce gaps as much as we can | ||
- | + | * | |
- | * Cross-scan sampling per precession | + | * Cross-scan sampling per precession |
- | * Currently, T_prec = 10 hours, T_spin = 1 min, which lead to theta = 3' | + | * Currently, T_prec = 10 hours, T_spin = 1 min, which lead to theta = 3' |
- | * 3' is good for 100 GHz, but not above; we can change T_spin or T_precession | + | * 3' is good for 100 GHz, but not above; we can change T_spin or T_precession |
- | * Kris does not think changing T_precession / T_ spin can solve the problem globally. Very long precession, penalty is pile up enormously at poles. | + | * Kris does not think changing T_precession / T_ spin can solve the problem globally. Very long precession, penalty is pile up enormously at poles. |
- | * we are assuming engineering achieving nominal, by 1 arcmin in 3 sigma error per spin. | + | * we are assuming engineering achieving nominal, by 1 arcmin in 3 sigma error per spin. |
+ | * Point reconstruction | ||
+ | * alignment of instrument FOV with reference of spacecraft. change should not be faster than calibration | ||
+ | * Jacques: we need to do simulation to get final number for point reconstruction | ||
+ | * Shaul: 1’’ will be driven by systematics. We will see if 1’’ is reasonable given r value. | ||
+ | * Amy: too loose, worse systematics; | ||