Go to the U of M home page
School of Physics & Astronomy
Probe Mission Study Wiki
imagerteleconnotes20180516

This is an old revision of the document!


Telecon 20180516

Attending: Brian, Tom, Kris, Hannes, Jacque, Shaul, Karl, Qi,

Notes by : Qi

Agenda

  • Precession Period (Kris, Jacques)
    • 10 hour precession period:
    • 48 hour precession period:
  • Noise Requirements vs Best Case Estimate (BCE)
    • Proposal: Req = BCE*rt(2)/0.9, independent of frequency
    • rt(2) because “Planck achieved noise within ~20% of BCE” (to be checked)
    • 0.9 because the cost models assume 90% yield
    • first factor is applied on individual detectors, second factor on the array.

Notes

  • Precession Period (Kris)
    • Shaul: we've debating whether fast or slow precession; Jacques's argument was too fast precessions give large gaps
    • high-resolution, 1.6 arcmin simulations
    • 10 hours vs 48 hours
    • first slide
      • blue (or gray on right side) is either 0 or just a few hits
imagerteleconnotes20180516.1526502281.txt.gz · Last modified: 2018/05/16 15:24 by wenxx181