Go to the U of M home page
School of Physics & Astronomy
Probe Mission Study Wiki

User Tools


imagerteleconnotes20180620

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
imagerteleconnotes20180620 [2018/06/20 13:21] – created hananyimagerteleconnotes20180620 [2018/06/20 17:04] (current) wenxx181
Line 1: Line 1:
 ====== Telecon 20180620 ====== ====== Telecon 20180620 ======
  
-Attending: +Attending: Jamie, Brian, Tom, Shaul, Qi
  
 Notes by : Qi Notes by : Qi
  
 === Agenda === === Agenda ===
-  * Mechanical design of focal plane (Qi)+  * {{::20180620_focalplane_mechanicaldesign.pdf|Mechanical design of focal plane }}(Qi) 
   * 2-year, 4 detector, simulated maps available - next steps? (Kris)    * 2-year, 4 detector, simulated maps available - next steps? (Kris) 
-  * Report Writing+  * {{::picoreport.pdf|Report Writing }} 
 +  * Remaining key open areas: **Thermal Design (JPL)**; Changing telecons to a lower cadence: two weeks? 
 + 
 +=== Notes === 
 +Mechanical design of focal plane 
 +    * Jamie shared the experience with Bicep3 focal plane: 
 +      * heat sink:  gold frames and wires around perimeter of wafer. They found contact resistance is the main issue. Biggest thermal impedance comes from between gold and silicon; at 100mK, conductance is mainly through electrons, pushing harder does not help. 
 +      * 4 clamps push down the wafers, but wafers can still slide; clamps don't short the instruments. 
 +      * In theory, gold wires and bars play the role of RF shields. 
 +    * PICO has a preliminary design, which can be used to estimate the mass already; more details about how to mount wafers on frames are ongoing 
 +    * material of frame: copper vs invar? Jamie: invar has high capacity, large mount of magnetic material 
 +    * bump bonds should be straightforward on PICO time scale  
 +    * Karl knows the size of TDM, **Qi to find out what Karl has concluded (AI)** 
 + 
 +Report writing  
 +    * page 4, section 3 Instrument is most relevant 
 +    * internal review 
 +    * by the end of August 
 + 
 +Thermal design 
 +    * we don't have one yet, JPL is responsible. 
 + 
 +**No objection against changing the telecon cadence to 2 weeks.** 
 + 
imagerteleconnotes20180620.1529518889.txt.gz · Last modified: 2018/06/20 13:21 by hanany