Go to the U of M home page
School of Physics & Astronomy
Probe Mission Study Wiki

User Tools


imagerteleconnotes20180620

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
imagerteleconnotes20180620 [2018/06/20 13:23] hananyimagerteleconnotes20180620 [2018/06/20 17:04] (current) wenxx181
Line 1: Line 1:
 ====== Telecon 20180620 ====== ====== Telecon 20180620 ======
  
-Attending: +Attending: Jamie, Brian, Tom, Shaul, Qi
  
 Notes by : Qi Notes by : Qi
  
 === Agenda === === Agenda ===
-  * Mechanical design of focal plane (Qi)+  * {{::20180620_focalplane_mechanicaldesign.pdf|Mechanical design of focal plane }}(Qi) 
   * 2-year, 4 detector, simulated maps available - next steps? (Kris)    * 2-year, 4 detector, simulated maps available - next steps? (Kris) 
   * {{::picoreport.pdf|Report Writing }}   * {{::picoreport.pdf|Report Writing }}
 +  * Remaining key open areas: **Thermal Design (JPL)**; Changing telecons to a lower cadence: two weeks?
 +
 +=== Notes ===
 +Mechanical design of focal plane
 +    * Jamie shared the experience with Bicep3 focal plane:
 +      * heat sink:  gold frames and wires around perimeter of wafer. They found contact resistance is the main issue. Biggest thermal impedance comes from between gold and silicon; at 100mK, conductance is mainly through electrons, pushing harder does not help.
 +      * 4 clamps push down the wafers, but wafers can still slide; clamps don't short the instruments.
 +      * In theory, gold wires and bars play the role of RF shields.
 +    * PICO has a preliminary design, which can be used to estimate the mass already; more details about how to mount wafers on frames are ongoing
 +    * material of frame: copper vs invar? Jamie: invar has high capacity, large mount of magnetic material
 +    * bump bonds should be straightforward on PICO time scale 
 +    * Karl knows the size of TDM, **Qi to find out what Karl has concluded (AI)**
 +
 +Report writing 
 +    * page 4, section 3 Instrument is most relevant
 +    * internal review
 +    * by the end of August
 +
 +Thermal design
 +    * we don't have one yet, JPL is responsible.
 +
 +**No objection against changing the telecon cadence to 2 weeks.**
 +
 +
imagerteleconnotes20180620.1529519029.txt.gz · Last modified: 2018/06/20 13:23 by hanany