imagerteleconnotes20180620
This is an old revision of the document!
Telecon 20180620
Agenda
Mechanical design of focal plane (Qi)
2-year, 4 detector, simulated maps available - next steps? (Kris)
-
Remaining key open areas: cryogenics; Changing telecons to a lower cadence: two weeks?
imagerteleconnotes20180620.1529519417.txt.gz · Last modified: 2018/06/20 13:30 by hanany