imagerteleconnotes20180620
This is an old revision of the document!
Telecon 20180620
Agenda
-
2-year, 4 detector, simulated maps available - next steps? (Kris)
-
Remaining key open areas: Thermal Design (JPL); Changing telecons to a lower cadence: two weeks?
imagerteleconnotes20180620.1529521146.txt.gz · Last modified: 2018/06/20 13:59 by hanany