This is an old revision of the document!
Telecon 20180620
Attending: Jamie, Brian, Tom, Shaul, Qi
Notes by : Qi
Agenda
-
2-year, 4 detector, simulated maps available - next steps? (Kris)
-
Remaining key open areas: Thermal Design (JPL); Changing telecons to a lower cadence: two weeks?
Notes