Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
private:teleconsnotes20170531 [2017/05/31 15:27] – jbock | private:teleconsnotes20170531 [2017/05/31 18:22] (current) – lknox | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Telecon Notes 20170531 ====== | ====== Telecon Notes 20170531 ====== | ||
- | Attendance: | + | Attendance: Amy, Jeff, Rafael, Al, Clem, Lloyd, Jamie, Charles |
Notes by Amy | Notes by Amy | ||
- | **Probe PI telecom**: Slides 2-6 (was 70 slides in 2hr – only talking about most relevant topics here) | + | **Schedule:** |
- | Shaul adds: not expecting final designs or conclusions at AAS | + | * What other milestones need to be included |
- | Shaul has suggested | + | * Review timelines |
- | Comment: Should have descopes/ | + | |
- | + | ||
- | **Plan for Systematics**: Slide 7 | + | |
- | Shaul suggests that Brendan (Systematics Czar) starts thinking about this and making a plan for what to do. | + | Generally felt the science workshops are very important and should be included |
- | Comment: since we are low budget, good to start with existing stuff, not duplicate effort | + | |
- | Comment (Clem): S4 plan at the moment is about setting requirements on what systematics need to be, which is different from saying what instrument will deliver. | + | |
- | Comments: For a number of systematics, | + | |
- | Shaul: first thing to look at for Probe is requirements | + | |
- | Comments: Remember that the audience of this paper isn’t necessarily going to be interested in a highly detailed analysis of many systematics | + | |
- | Comment: What if systematics analysis impacts our decision on imager-only or imager+spectrometer? | + | |
- | Comment (Al): systematics for spectrometer are very different than those for an imager | + | |
- | + | ||
- | **Plans for Technology**: | + | |
- | Shaul notes: (from PI telecom) these are not proposals | + | Decided to make an updated schedule, including this discussion and Amy's workforce and list of developments |
- | Comments: Cost for space-qualified kilo-pixels arrays (and electronics…) are much larger than for ground – big cost multipliers – need to get our heads around what these cost multipliers are | + | |
- | Comments: | + | |
- | Comments: Should think twice before considering including two focal plane technologies in our proposed baseline – don’t want to raise red flags in cost and risk. Because this isn’t | + | |
- | Comment: KIDs haven’t flown on balloons, but BLAST will change that soon | + | |
- | Comment (Amy): Have some budget for Roger OBrient to support - survey tech options in detectors, optical coupling, readout, and current TRLs, etc. | + | |
- | Action item: Jeff, Amy, Roger, to talk to brainstorm a plan | + | |
- | + | ||
- | **Imager / Frequency Bands**: Slides 9-10 | + | |
- | Shaul: It’s our understanding that LiteBIRD | + | (Amy) familiar with imager approach, but need more information on spectrometer in order to judge effort for combined architecture |
- | Shaul: More information about this topic in Probe Mission Wiki (not exec committee) – under [[:imageroptions|Image Options]] working | + | |
- | Comment (Clem): Place to measure foregrounds may be close in (to foreground minimum) where differences | + | Al says he will present slides on design options for the spectrometer |
- | Comment: Note angular resolution not as good at lower frequencies | + | |
- | Comment | + | **Update from Raphael:** |
- | Shaul: wants to proceed with a nominal focal plane so we can begin simulations | + | |
+ | * what's happening with the theory | ||
+ | * what is the plan of work? | ||
+ | * what/when are the milestones? | ||
+ | |||
+ | Have compiled a list of volunteers | ||
**Action Items:** | **Action Items:** | ||
========================== | ========================== | ||
- | |||
- | - Ordered List Item | ||
- Raphael will organize a group of people who will work on a particular target for r | - Raphael will organize a group of people who will work on a particular target for r | ||
- | - Lloyd will coordinate the data challenge; Shaul to work on band and noise definitions | + | - Lloyd will coordinate the data challenge |
+ | so far this has become a list of names, will come up with a draft plan for discussion on June 14 | ||
+ | - Shaul to work on band and noise definitions | ||
+ | - Lloyd to try to find someone to work on extragalactic science case (including complementarity with ground) | ||
- Julian will set up a probe project space at NERSC. | - Julian will set up a probe project space at NERSC. | ||
- Al will organize a group that will assess the motivation for a super-pixie or develop the case for compspec (complementary spectrometer) | - Al will organize a group that will assess the motivation for a super-pixie or develop the case for compspec (complementary spectrometer) | ||
+ | in progress, will result in a presentation in 2 weeks | ||