Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
private:teleconsnotes20170607 [2017/06/07 15:06] – jbock | private:teleconsnotes20170607 [2017/06/08 20:48] (current) – atrangsr | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Telecon Notes 20170607 ====== | ====== Telecon Notes 20170607 ====== | ||
- | Attendance: Amy, Jeff, Rafael, Al, Clem, Lloyd, Jamie, Charles | + | Attendance: |
Notes by Amy | Notes by Amy | ||
- | **Schedule:** | + | **Update from Brendan on Systematics plan** (see " |
- | * What other milestones need to be included | + | Do we know what CORE did? Brendan doesn' |
- | * Review timelines | + | |
- | * What questions need to be investigated/ | + | |
- | Generally felt the science workshops are very important and should be included and planned. | + | **Update from Jeff on Technology Plan** (no slides - Jeff has been on travel) |
- | + | ||
- | Decided to make an updated schedule, including this discussion and Amy's workforce and list of developments for the mission study. | + | |
- | + | ||
- | (Amy) familiar with imager approach, but need more information on spectrometer in order to judge effort for combined architecture and going from there to team-X study if included. | + | |
- | + | ||
- | Al says he will present slides on design options for the spectrometer in 2 weeks. | + | |
- | + | ||
- | **Update from Brendan:** | + | |
- | * what are the plans for setting requirements for systematics? | + | |
- | * Is there a plan to set up a ' | + | |
- | * what are the plans with addressing spacecraft specific systematics | + | |
- | + | ||
- | **Update from Jeff:** | + | |
- | * addressing the technology development | + | |
- | * What are the key development items? | + | |
- | * How does the 'tech group' plans to address them? | + | |
- | + | ||
- | **Update from Kris Gorski:** | + | |
- | * review of EPIC-IM + CORE scan strategy; possible modifications for the Polarization Probe | + | |
+ | Jeff not sure what his role/scope is intended to be as Technology Lead. Some discussion about this (mostly Amy, Jeff, Jamie) brought some clarity/ | ||
**Action Items:** | **Action Items:** | ||
========================== | ========================== | ||
- | * Raphael will organize | + | * Raphael will provide |
- | * Lloyd will coordinate the data challenge | + | * Lloyd will coordinate the data challenge, will come up with a draft plan for discussion on June 14 |
- | so far this has become a list of names, will come up with a draft plan for discussion on June 14 | + | |
* Shaul to work on band and noise definitions | * Shaul to work on band and noise definitions | ||
* Lloyd to try to find someone to work on extragalactic science case (including complementarity with ground) | * Lloyd to try to find someone to work on extragalactic science case (including complementarity with ground) | ||
* Julian will set up a probe project space at NERSC | * Julian will set up a probe project space at NERSC | ||
- | * Al will organize a group that will assess the motivation for a super-pixie or develop the case for compspec (complementary spectrometer) | + | * Al will organize a group that will assess the motivation for a super-pixie or compspec (complementary spectrometer) |
- | in progress, will result in a presentation in 2 weeks | + | * Update schedule based on inputs from 5/31 telecon |
- | * Update schedule based on inputs from 5/31 telecon | + | * Investigate if a non-EC member wants to host a foregrounds/ |