Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
private:teleconsnotes20170628 [2017/06/28 15:59] – bcrill | private:teleconsnotes20170628 [2017/06/28 16:36] (current) – bcrill | ||
---|---|---|---|
Line 15: | Line 15: | ||
* Update on NASA management of probes and expected deliverables (Shaul) | * Update on NASA management of probes and expected deliverables (Shaul) | ||
* {{: | * {{: | ||
+ | * Entire slide package is also available on the wiki. | ||
+ | * Study report is ~50 pages. | ||
+ | * Engineering Concept Definition Package: prepared by JPL. This is only submitted to the decadal panel on request. | ||
+ | * Can we find out what tools/ | ||
+ | * Independent Cost Estimate does not include pre-phase A technology maturation costs, but we should be careful about including too many low maturity technologies to avoid large cost penalties. | ||
* Imager WG Update (Shaul) | * Imager WG Update (Shaul) | ||
+ | * first draft baseline imager (optics/ | ||