Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| private:teleconsnotes20170628 [2017/06/28 16:13] – bcrill | private:teleconsnotes20170628 [2017/06/28 16:36] (current) – bcrill | ||
|---|---|---|---|
| Line 17: | Line 17: | ||
| * Entire slide package is also available on the wiki. | * Entire slide package is also available on the wiki. | ||
| * Study report is ~50 pages. | * Study report is ~50 pages. | ||
| - | * Engineering Concept Definition Package: prepared by JPL. This is only submitted to the decadal panel on request. | + | * Engineering Concept Definition Package: prepared by JPL. This is only submitted to the decadal panel on request. |
| + | * Can we find out what tools/ | ||
| + | * Independent Cost Estimate does not include pre-phase A technology maturation costs, but we should be careful about including too many low maturity technologies | ||
| * Imager WG Update (Shaul) | * Imager WG Update (Shaul) | ||
| + | * first draft baseline imager (optics/ | ||