Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| private:teleconsnotes20170628 [2017/06/28 16:29] – bcrill | private:teleconsnotes20170628 [2017/06/28 16:36] (current) – bcrill | ||
|---|---|---|---|
| Line 21: | Line 21: | ||
| * Independent Cost Estimate does not include pre-phase A technology maturation costs, but we should be careful about including too many low maturity technologies to avoid large cost penalties. | * Independent Cost Estimate does not include pre-phase A technology maturation costs, but we should be careful about including too many low maturity technologies to avoid large cost penalties. | ||
| * Imager WG Update (Shaul) | * Imager WG Update (Shaul) | ||
| + | * first draft baseline imager (optics/ | ||