Campuses:
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
private:teleconsnotes20170809 [2017/08/09 14:18] – created hanany | private:teleconsnotes20170809 [2017/08/16 14:49] (current) – hanany | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Telecon Notes 20170809 ====== | ====== Telecon Notes 20170809 ====== | ||
- | Attendance: \\ | + | Attendance: |
- | Notes by: \\ | + | Notes by: Pryke \\ |
=== Agenda === | === Agenda === | ||
Line 8: | Line 8: | ||
* Workshops (Shaul, Raphael) | * Workshops (Shaul, Raphael) | ||
* TeamI+X sessions at JPL (Shaul) | * TeamI+X sessions at JPL (Shaul) | ||
- | | + | |
+ | * TeamI: March 13 - March 15, 2018 | ||
+ | * TeamX: March 20 - 21, 2018 | ||
+ | * {{: | ||
* Update from Data Challenge WG (Lloyd+Julian+Raphael) | * Update from Data Challenge WG (Lloyd+Julian+Raphael) | ||
* Update from Galactic Science WG (Laura Fissel, Dave Chuss) | * Update from Galactic Science WG (Laura Fissel, Dave Chuss) | ||
+ | |||
+ | === Notes === | ||
+ | |||
+ | dates for FG WS set Oct 30, 31 Nov 1 UCSD space for 100+ Raphael organizing | ||
+ | |||
+ | Harvard S4 WS draft agenda has "S3 relation to space and balloons" | ||
+ | |||
+ | Discussion about whether spring 18 S4 WS can be joint with probe study - remains unclear | ||
+ | |||
+ | TeamI session dates fixed: Dec 19-21 + Mar 13-15, TeamX Mar 20-21 | ||
+ | |||
+ | Shaul describes Imager WG slides on wiki. Baseline design mid size reflector with multi-chroic bolometers. Starting points EPIC and CORE studies. Initial questions: optics: cross-Dragone has strong sidelobe. EPIC argued this was OK given scan strategy etc. Not clear this is true at the lower noise levels now being considered. Considering " | ||
+ | |||
+ | Charles asks if two telescope designs have been considered (WMAP did it). | ||
+ | |||
+ | Shaul: not really at this point - but it's an interesting idea. | ||
+ | |||
+ | Shaul: describes starting point for focal plane model. TES multi-chroic up to 555GHz. Have some sim maps available from previous studies. Outlined near term timeline. | ||
+ | |||
+ | Chuss: Galactic science update based on minutes of initial working group meeting. armin res at 850GHz is interesting. For star formation could fill in the " | ||
+ | |||
+ | Shaul: is it the 1arcmin or the 850GHz that people like? | ||
+ | |||
+ | Chuss: the 1arcmin really. | ||
+ | |||
+ | Chuss: Diffuse ISM: CMBP sensitivity should be sufficient. Question was asked if CMBP would be scooped by optical pol + GAIA. Doesn' | ||
+ | |||
+ | Pryke: opt pol + GAIA is in principle 3d? | ||
+ | |||
+ | Chuss: yes - but CMBP would still be complementary allowing to add the high res part of the picture. | ||
+ | |||
+ | Pol spectrum: Some support for FTS instrument here. | ||
+ | |||
+ | External galaxies: 1 arcmin means >10 measurements across each gal out to 10Mpc - 1000 gal would be surveyed. Would be really nice uniform data set. | ||
+ | |||
+ | Other topics: some others were thrown out and will be further considered. | ||
+ | |||
+ | Overall: quite a lot of enthusiasm and more telecons will follow. | ||
+ | |||
+ | Discussion of how to capture the science versus resolution tradeoffs. | ||
+ | |||
+ | Shaul: what if we loose highest band and the resolution goes down? | ||
+ | |||
+ | * __Team I Instrument Study__: \\ | ||
+ | Facilitator \\ | ||
+ | Systems \\ | ||
+ | Deputy Systems \\ | ||
+ | Configuration | ||
+ | Cost\\ | ||
+ | Electronics\\ | ||
+ | Mechanical\\ | ||
+ | Optics\\ | ||
+ | Detectors (probably use Roger for continuity)\\ | ||
+ | Thermal (probably use Chris for continuity) \\ | ||
+ | |||
+ | * __Team X Mission/ | ||
+ | Facilitator \\ | ||
+ | Systems\\ | ||
+ | Deputy Systems\\ | ||
+ | ACS (attitude control)\\ | ||
+ | CDS (command and data)\\ | ||
+ | Configuration\\ | ||
+ | Cost\\ | ||
+ | Ground Systems\\ | ||
+ | Instruments\\ | ||
+ | Mechanical\\ | ||
+ | Mission Design\\ | ||
+ | Power\\ | ||
+ | Propulsion\\ | ||
+ | Science\\ | ||
+ | Software\\ | ||
+ | SVIT (system level integration and test)\\ | ||
+ | Telecom\\ | ||
+ | Thermal\\ | ||