Campuses:
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
private:teleconsnotes20170906 [2017/09/06 12:17] – created hanany | private:teleconsnotes20170906 [2017/09/06 16:20] (current) – lknox | ||
---|---|---|---|
Line 5: | Line 5: | ||
=== Agenda === | === Agenda === | ||
+ | * Brief Updates | ||
+ | - Time for telecons | ||
+ | - Foreground Workshop (Raphael) | ||
+ | - PICO Name http:// | ||
+ | * {{: | ||
+ | - anything else we should do | ||
+ | - anything we should do different | ||
+ | |||
=== Notes ==== | === Notes ==== | ||
+ | |||
+ | * Baseline sensitivities and frequencies exist for the Imager | ||
+ | * Working groups working on making first forecasts with baseline sensitivies, | ||
+ | * WGs also beginning to work on filling out their parts of STM | ||
+ | * Results of these activities due end of September | ||
+ | * Charles mentions we don't have what we need for foregrounds, | ||
+ | * Charles says most important question is, how do we get sufficient angular resolution at low frequencies? | ||
+ | * LK to contact Kovac regarding optimization across bands. | ||
+ | * Al pushes back on Charles' | ||
+ | * Charles: Here's a number for 3 or 10 deg patches of sky for judging plausibility: | ||
+ | * SH: we are using a 3m dish in baseline, so 21 GHz beam size is fwhm=41' | ||
+ | * LK: that might be sufficient. 40 GHz would be 20', below the 26' that Raphael used as " | ||
+ | * SH: We might go back to Cross-Dragone. Would preserve effective aperture size. | ||
+ | * Spectrometer | ||
+ | * Decision point on whether to include has to be on October 11. | ||
+ | * What are implementation tradeoffs? Shaul' | ||
+ | * This is just a geometry check. Does it fit in the volume? No check on e.g., power, cost. | ||
+ | * SH: Amy has a cost assessment that shows the imager would have to shrink down to " | ||
+ | * AK: WE can get some engineering support from GSFC, particular in next couple weeks before fiscal year runs out. | ||
+ | * SH: Important question: what is the scope of these two instruments? | ||
+ | * AK: Colin Hill will put together a talk for this. | ||
+ | * Colin isinvited to attend and is available. | ||
+ | * Instrument Design | ||
+ | * Cost model is built | ||
+ | * Kris is working on scan strategy. SH says going slower than he had hoped it would go. Will touch base again with Kris this week. We may want to engage other people who have more bandwidth and time for this. | ||
+ | * CL: Talk to Kris. Let me know if it looks like there' | ||
+ | * Workshops: FG workshop | ||
+ | * not happening! LK and JB to try to get SOC for the meeting together and operating | ||
+ | * SH: we will need to decide aboout spring possible CMB-S4 joint workshop in November. | ||
+ | * LK: S4 might be ready to deal with that then, post SOC--> ICCC phase transition with some time for settling down. | ||
+ | * SH: data challenge very important! | ||
+ |