Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| private:teleconsnotes20170906 [2017/09/06 16:19] – lknox | private:teleconsnotes20170906 [2017/09/06 16:20] (current) – lknox | ||
|---|---|---|---|
| Line 45: | Line 45: | ||
| * SH: we will need to decide aboout spring possible CMB-S4 joint workshop in November. | * SH: we will need to decide aboout spring possible CMB-S4 joint workshop in November. | ||
| * LK: S4 might be ready to deal with that then, post SOC--> ICCC phase transition with some time for settling down. | * LK: S4 might be ready to deal with that then, post SOC--> ICCC phase transition with some time for settling down. | ||
| + | * SH: data challenge very important! | ||