Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
private:teleconsnotes20170906 [2017/09/06 16:19] – lknox | private:teleconsnotes20170906 [2017/09/06 16:20] (current) – lknox | ||
---|---|---|---|
Line 45: | Line 45: | ||
* SH: we will need to decide aboout spring possible CMB-S4 joint workshop in November. | * SH: we will need to decide aboout spring possible CMB-S4 joint workshop in November. | ||
* LK: S4 might be ready to deal with that then, post SOC--> ICCC phase transition with some time for settling down. | * LK: S4 might be ready to deal with that then, post SOC--> ICCC phase transition with some time for settling down. | ||
+ | * SH: data challenge very important! | ||