Go to the U of M home page
School of Physics & Astronomy
Probe Mission Study Wiki

User Tools


private:teleconsnotes20180314

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
private:teleconsnotes20180314 [2018/03/14 20:59] hananyprivate:teleconsnotes20180314 [2018/03/14 21:00] (current) hanany
Line 46: Line 46:
  
 ---- ----
 +E-mail from Lloyd
  
-Decadal Survey timeline, from John C’s S4 presentation+Decadal Survey timeline, [[https://cmb-s4.org/CMB-S4workshops/index.php/File:CMB-S4_DecadalPlanning_v2.pdf|from John C’s S4 presentation]]
  
   * Fall 2018: Survey Chair selected (could be much sooner)    * Fall 2018: Survey Chair selected (could be much sooner) 
Line 69: Line 70:
   * Hoping to iterate with TeamX and their slides to send correct message to ICE.   * Hoping to iterate with TeamX and their slides to send correct message to ICE.
     * AT: this is a reasonable expectation. Matches my conversations with TeamX.  Have talked to TeamX folks about different audience for slides this time around.     * AT: this is a reasonable expectation. Matches my conversations with TeamX.  Have talked to TeamX folks about different audience for slides this time around.
- 
  
  
  
private/teleconsnotes20180314.1521079166.txt.gz · Last modified: 2018/03/14 20:59 by hanany