Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
private:teleconsnotes20190109 [2019/01/09 14:44] – hanany | private:teleconsnotes20190109 [2019/01/09 15:52] (current) – kyoung | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Telecon Notes January 9, 2019 ====== | ====== Telecon Notes January 9, 2019 ====== | ||
- | Attendance: | + | Attendance: |
Notes by: Karl \\ | Notes by: Karl \\ | ||
=== Agenda === | === Agenda === | ||
+ | * Additional Telecon on Friday at 3 pm Central Time = 4 pm Eastern; 1 pm Pacific. | ||
* Brief update on report outstanding items | * Brief update on report outstanding items | ||
* implemented details contributions by Marcel, Jacques, Jim (clusters) | * implemented details contributions by Marcel, Jacques, Jim (clusters) | ||
* Few updates outstanding in Inflation (Fig. 2.1; 2.2; ES) | * Few updates outstanding in Inflation (Fig. 2.1; 2.2; ES) | ||
- | * Need review of what's stated SOs | + | * Need review of what's stated |
* Why PICO now? | * Why PICO now? | ||
- | * Finalizing Cover Art {{: | + | * Finalizing Cover Art {{: |
* Smaller PICO (< = 0.5!) | * Smaller PICO (< = 0.5!) | ||
* Thicker dotted lines | * Thicker dotted lines | ||
Line 23: | Line 23: | ||
* 10 sky surveys | * 10 sky surveys | ||
* multiple time scales: 1 min, 10 hours, 6 months | * multiple time scales: 1 min, 10 hours, 6 months | ||
+ | |||
+ | |||
+ | === Notes === | ||
+ | |||
+ | ** Next telecon Friday 3pm CST ** | ||
+ | |||
+ | Brief update on report outstanding items, SH: In fairly good shape. | ||
+ | * implemented details contributions by Marcel, Jacques, Jim (clusters) | ||
+ | * SH: Lots of good review from Marcel. Got Jacques' | ||
+ | * SH: Tim is cleaning up details of latex and grammar | ||
+ | * Few updates outstanding in Inflation (Fig. 2.1; 2.2; ES) | ||
+ | * **Waiting on updates from Raphael** | ||
+ | * Need review of what's stated in SOs. Ensure consistency. Checks needed by SO authors as well as unrelated folks. | ||
+ | * Checks of STM (Table 1.3) over next 1-2 days. | ||
+ | * S01, S02. Inflation. **SH will write to Raphael to have him check** | ||
+ | * S03, S04. Neutrinos, Neff. **Nick will check** | ||
+ | * S05. Reionization. **Alex will check** | ||
+ | * S06, S07. **SH will ask Dave, Laura, and a less tightly connected galactic member. ** | ||
+ | |||
+ | |||
+ | Why PICO now? | ||
+ | * SH: Exec summary gives a strong science case. But 'why now' is not so obvious. Any input for this argument? | ||
+ | * CL: Question is, "why isn't it better to wait for S4, SO, and similar" | ||
+ | * AT: Some missions have to fly now (e.g. Starshade because works with WFIRST). | ||
+ | * AT: Also mitigate the " | ||
+ | * JD: Much work is going into CMB now. We should support that. | ||
+ | * CL: UV or X-ray astronomers may say they have waited 20-30 yrs for another mission, not the 10-15 since Planck. | ||
+ | * CL: but key argument is where you get the most science for the money. CMB has been a very good value. | ||
+ | * SH: Sometimes there is a good reason to wait (technology, | ||
+ | * CL: in 2010 there where 2 reasons to wait. 1. Planck. 2. ground experiments were ramping up. what if they see a hint? | ||
+ | * CL: Planck has flown and is fully analyzed. | ||
+ | * CL: Not a strong counter to argument 2. There are still new ground experiments coming up all the time. | ||
+ | * JD: Can we argue that what is learned from ground won't change mission? | ||
+ | * SH: Should be little careful about things being impossible at largest angular scales. CLASS is trying to get EE on largest scales. Got some push back from Bennett. | ||
+ | * CL: " | ||
+ | * MS: Could argue that 2030's will be stuck without PICO. because of the things you can't ever do from the ground. | ||
+ | * AT: Is the argument? "Other people will have to wait if PICO doesn' | ||
+ | * SH: Is it timely to say that this is the time for a space mission? We are scaling up to massive collabs on the ground. So scaling up to a space mission makes sense. | ||
+ | * CL: Ties into JD's argument about how would PICO change with new ground data. S4 is basically the final ground experiment, another factor of 10 is just too expensive. So we have to go to space. Starting now on PICO then makes sense. | ||
+ | * JD: Striking that in US and around world many groups are putting together proposals that are similar to PICO or part of PICO. Suggests interest and options for international partners. | ||
+ | * | ||
+ | |||
+ | Finalizing Cover Art {{: | ||
+ | * Smaller PICO (< = 0.5!) | ||
+ | * SH: Strong votes over email. | ||
+ | * Thicker dotted lines | ||
+ | * End of Dark Energy line: extend inward by ~0.5 in (should be longer than neutrino) | ||
+ | * Dark matter: make fading same as cosmic birefringence | ||
+ | * Cluster evolution extend inward by 1 in (should be longer than galaxy evolution) | ||
+ | * Luminous sources: move a bit outward to coincide with center of white circle. | ||
+ | * CL: Still think this is very cool. | ||
+ | * SH: originally came from Cynthia Chang via Alex. Shaul reached out and offered recognition. She passed. She had got the idea from somewhere else as well. But thanks to Alex for idea. | ||
+ | * ALL: No other comments. | ||
+ | |||
+ | |||
+ | Control of Systematic Uncertainties. | ||
+ | * examples: 12,996 independent I,Q,U maps; 10 sky surveys; multiple time scales: 1 min, 10 hours, 6 months | ||
+ | * JD: A bit of a weakness, the 12996 maps are high noise so you can't just look at single bolo maps. | ||
+ | * SH: True. the 12996 was to show multiplicity of options. can make 4 maps of 3000, 2 of 6000, etc. | ||
+ | * CL: But looking pair by pair at bolos can be done on T for calibrating between detectors effectively. This is possible for many combos in PICO. And this can be done on relativity short timescales. | ||
+ | * JD: for redundancy with Planck. There was only small area of the sky covered in multiple days. PICO is different. | ||
+ | * SH: Now 50% of sky in 2 weeks. | ||
+ | * JD: Then repeat the same (almost) 50% 2 weeks, 4 weeks, 2 months later. Very good redundancy. | ||
+ | |||
+ | JD: What is final endorsement deadline? | ||
+ | * SH: Anything this week and early next week is fine. AFter that probably not. Want this report done. | ||
+ | |||
+ | Meeting Friday, then final telecon next Wednesday. |