Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
systematicswg:telecons:2018-01-17:start [2018/01/17 12:02] – bcrill | systematicswg:telecons:2018-01-17:start [2018/01/17 12:05] (current) – bcrill | ||
---|---|---|---|
Line 18: | Line 18: | ||
** proposing to ESA (6 March deadline), building up a consortium for a larger 3 year cubesat project. | ** proposing to ESA (6 March deadline), building up a consortium for a larger 3 year cubesat project. | ||
** The idea: a piggyback satellite that autonomously deploys and positions itself. | ** The idea: a piggyback satellite that autonomously deploys and positions itself. | ||
+ | ** goal is a few kg mass, and cost ~ 1% of total cost of mission. | ||
** The idea is to " | ** The idea is to " | ||
* Cover wide frequency band: 10's of GHz, 40-400 GHz originally conceived. | * Cover wide frequency band: 10's of GHz, 40-400 GHz originally conceived. |