Go to the U of M home page
School of Physics & Astronomy
Probe Mission Study Wiki

User Tools


systematicswg:telecons:2018-01-17:start

This is an old revision of the document!


Notes for Jan 17 2018 Telecon

On the call: Brendan, Maurizio, Shaul, Joy, Enrique

  • PICO workshop early May: two days out of the week of April 30 - May 3, at Minneapolis
    • * a good deadline for finishing the bulk of our work
    • * proposing an hour or so presentation on systematics, plus 1 hour
  • updates on The Big Three
    • * nominal scan strategy information can be found here: https://zzz.physics.umn.edu/ipsig/optimizingscanstrategy/start
    • * Plan for toast runs: PICO focal plane layout not trivial(because not hex-packed), but LBL folks. Four detectors are no problem.
    • * Gain stability: Maurizio about to get started: similar analysis as done for CORE, sims of dipole observations + sims of gains per detector, use custom mapmaking code to solve for gain drift. Look at the CORE systematics paper.
    • * Far Sidelobes: GRASP sims available (see Imager page).
    • * Absolute Polarization Angle calibration. Analytic solution to look at what happens when we don't solve for absolute polarization angle (by say, minimizing EB and TB).
  • Cubesat calibration concept
systematicswg/telecons/2018-01-17/start.1516209902.txt.gz · Last modified: 2018/01/17 11:25 by bcrill