Go to the U of M home page
School of Physics & Astronomy
Probe Mission Study Wiki

User Tools


systematicswg:telecons:2018-03-28:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
systematicswg:telecons:2018-03-28:start [2018/03/28 10:48] bcrillsystematicswg:telecons:2018-03-28:start [2018/03/28 11:15] (current) bcrill
Line 1: Line 1:
 March 28 2018 telecon March 28 2018 telecon
  
-online: Brendan+online: Brendan, Maurizio, Eric
  
-  *+  * Updates 
 +    * GRASP: Karl 
 +    * Gain sims: stuck on toast problems.  Two bugs.  TOAST used to produce timelines, each node runs in parallel.  First bug: slight problem with sample indexing: each process overlaps by one sample. not serious. Second bug is a pointing problem at the boundary between each processes timeline.  Andrea and Ted were looking into this, but no news.  Brendan to talk to Julian to get updates.  Code benchmarking looked good. 
 +    * Angle calibration: no reports. 
 + 
 +  * Slides from KISS workshop at Caltech last week: http://kiss.caltech.edu/workshops/fCMB/fCMB.html 
 + 
 +  * PICO team meeting / workshop : systematics on morning of May 3   
 +  * Plan for a May 3 afternoon systematics meeting
systematicswg/telecons/2018-03-28/start.1522252139.txt.gz · Last modified: 2018/03/28 10:48 by bcrill