Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
systematicswg:telecons:2018-06-18:start [2018/06/18 11:37] – bcrill | systematicswg:telecons:2018-06-18:start [2018/06/18 12:02] (current) – bcrill | ||
---|---|---|---|
Line 12: | Line 12: | ||
* Maps are available for 2 year simulation requested by Kris: / | * Maps are available for 2 year simulation requested by Kris: / | ||
* Andrea was able to patch toast to bring in dacapo input. Allows gain estimation sims: 1. a map of the full sky reconstructed over 2 years and 4 detectors, 2. gain factors vs. time, and 3. a map that has the effects of residual gain errors. | * Andrea was able to patch toast to bring in dacapo input. Allows gain estimation sims: 1. a map of the full sky reconstructed over 2 years and 4 detectors, 2. gain factors vs. time, and 3. a map that has the effects of residual gain errors. | ||
- | * Maurizio can use these products to compute | + | * Maurizio can use these products to compute |
* Systematics section outline | * Systematics section outline | ||
+ | * Shaul wants to have a draft PICO report by September 1. The real one will be submitted to NASA in December | ||
+ | * Write a systematics paper? Is there anything particularly new in the PICO material? | ||
+ | * ideas for Maurizio' | ||
+ | * Eric's particular work is mostly a specific application of previous methods. | ||
+ | * PICO has a different scanning strategy from Litebird and CORE. | ||
+ | * Sidelobe pickup given the telescope is interesting: | ||
+ | * Brendan to make an outline for paper. | ||
+ | * Note: Brendan to be on vacation for 2 weeks. will be back for July 9 telecon. | ||
+ | * Eric will be gone Late July - early August. | ||
+ | | ||