Go to the U of M home page
School of Physics & Astronomy
Probe Mission Study Wiki

User Tools


systematicswg:telecons:2018-10-08:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
systematicswg:telecons:2018-10-08:start [2018/10/08 10:58] bcrillsystematicswg:telecons:2018-10-08:start [2018/10/08 12:15] (current) bcrill
Line 1: Line 1:
-On the call: Maurizio, Karl, Eric, Brendan+On the call: Maurizio, Karl, Eric, Brendan, Shaul
  
 == Agenda == == Agenda ==
Line 9: Line 9:
     * Andrea Z submitted simulation jobs yesterday evening - expecting execution in next day or two.     * Andrea Z submitted simulation jobs yesterday evening - expecting execution in next day or two.
   * Gain error figures for report   * Gain error figures for report
 +    * prior estimate of the CMB is not used - so text should reflect this point.
   * Merge all systematics figures into a single one?   * Merge all systematics figures into a single one?
   * Report draft {{:systematicswg:telecons:2018-10-08:systematics.pdf|}}   * Report draft {{:systematicswg:telecons:2018-10-08:systematics.pdf|}}
 +    * Make an additional offline document: there are plans to host a repository of PICO supplemental information (not just systematics) that would be available to the Decadal committee members.
 +  * Actions
 +    * Brendan: try to shrink table, moving full version to the supplemental document
 +    * Shaul, Eric, Maurizio: touch base to discuss plots this week (ahead of Shaul's talk in Tenerife next week).
systematicswg/telecons/2018-10-08/start.1539014322.txt.gz · Last modified: 2018/10/08 10:58 by bcrill