Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| systematicswg:telecons:2018-10-08:start [2018/10/08 11:26] – bcrill | systematicswg:telecons:2018-10-08:start [2018/10/08 12:15] (current) – bcrill | ||
|---|---|---|---|
| Line 9: | Line 9: | ||
| * Andrea Z submitted simulation jobs yesterday evening - expecting execution in next day or two. | * Andrea Z submitted simulation jobs yesterday evening - expecting execution in next day or two. | ||
| * Gain error figures for report | * Gain error figures for report | ||
| + | * prior estimate of the CMB is not used - so text should reflect this point. | ||
| * Merge all systematics figures into a single one? | * Merge all systematics figures into a single one? | ||
| * Report draft {{: | * Report draft {{: | ||
| * Make an additional offline document: there are plans to host a repository of PICO supplemental information (not just systematics) that would be available to the Decadal committee members. | * Make an additional offline document: there are plans to host a repository of PICO supplemental information (not just systematics) that would be available to the Decadal committee members. | ||
| + | * Actions | ||
| + | * Brendan: try to shrink table, moving full version to the supplemental document | ||
| + | * Shaul, Eric, Maurizio: touch base to discuss plots this week (ahead of Shaul' | ||