===== Agenda for April 22, 2010 ===== * Quick Summary of April Review * May 17 (Monday) meeting with DUSEL {{:engineering:template_for_dusel_m_145c88.ppt|Template Slides}} * Schedule being put into MicroSoft Project * Working Group Reports (see jobs below for reference) === Water Shield === == Make it real, talk to companies, do the engineering e.g. == * New Acrylic Companies contacted * Outer tank engineering == Develop infrastructure into shield (ductwork, electrical etc) == === Screener Group === == Work with Yuen-Dat to compile results of survey == == Define parameters of shielding and common elements between screeners == == Plan for screening at Sanford and schedule of installation and move == === Immersion Tank === == Continue cost and schedule for CTF == == compile relevant sections of survey (poll community about the functionality of the ultra sensitive screener) == === Characterization === == short term plans for this summer == * Mid-July for 2 weeks for undergrads from U Minn, SD, BHSU * Radon survey * Geographic survey * Need place to stay - who will find that? == long term plans for neutron work - neutron detectors at Soudan? ==