===== Agenda for April 8, 2010 ===== * Anything further needed before April 12? * Sent around Schedule: posted in [[:groups|Working Groups]] * Working Group Jobs. Next Milestone is the July 13-15 NSF review === Integration === == Refine cost and schedule == == Improve the conceptual design of the FAARM == == Implement information from other working groups == === Water Shield === == Make it real, talk to companies, do the engineering e.g. == * Door or labyrinth * Acrylic tunnel costs * Outer tank engineering == Develop infrastructure into shield (ductwork, electrical etc) == === Screener Group === == Work with Yuen-Dat to compile results of survey == == Define parameters of shielding and common elements between screeners == == Plan for screening at Sanford and schedule of installation and move == === Immersion Tank === == Continue cost and schedule for CTF == == compile relevant sections of survey (poll community about the functionality of the ultra sensitive screener == === Characterization === == short term plans for this summer - involve other groups == == long term plans for neutron work ==