====== Water Shield ====== - Description/Name: Water Shield in the FAARM Facility at the 4850' level - Planned use (be specific): - Primary function: provide common first-level gamma and neutron shielding for screening detectors and ultra-sensitive immersion tank - Temporary and permanent storage: will house screeners of various sensitivities, including alpha-beta counters, HPGe detectors, immersion tank - Sample and detector handling: accommodations for alpha-beta screeners, HPGe screeners, immersion tank - Jigs, fixtures, scaffolds, etc. necessary - Monorail for hoisting samples into water tank - E & O activities - Occupancy: - Steady: See occupancy listed under screening spaces - Peak: See occupancy listed under screening spaces - Adjacencies (list/distance): See adjacencies listed under screening spaces - Space size (gsf and/or WxLxH): approximately 2330 m^3 (excluding space beneath first floor which is approximately 1160 m^3) - 3 m shielding thickness - 2 m space between shield and cavern for egress and pipe - Experiment Systems: - Shielding: - Floor load (PSF): - perimeter: - water: approx. 80m x 20m x 3m is 4.8 x 10^6 kg or 10.6 x 10^6 lb (not up-to-date as of Dec. 22, 2009) - SS: - lower floor: - immersion tank: - HPGe detectors - upper floor: - No upper floor - Material handling (cranes, etc.) - Finishes (walls/floor/ceiling): - Casework: n.a. - Storage: n.a. - Furniture/Fixtures/Equipment (non-experiment): - Mechanical: - Environmental conditions: - Clean class: 2000 - Ventilation: - Exhaust: - Plumbing (domestic, waste, systems): - Fire Suppression: - Building Management System: - Fume hoods: - Chilled water - Other: - Electrical: - Power (clean and dirty): - Lighting: - Low Voltage/Data/Communication: - Fire Detection/Alarm: - Other: - Acoustical: - Vibration Isolation: - EMI/RFI Isolation: - Hazardous materials: - Special Consideration (expansion, etc.):