====== Acquisition and Storage of Materials ====== - Description/Name: Material Acquisition and Storage at the 800-ft level - Planned use (be specific): Produce pure materials and storage materials - Primary function: Production and storage - Temporary and permanent storage: Both - Sample and detector handling: - Jigs, fixtures, scaffolds, etc. necessary - E & O activities: Daily or weekly - Occupancy: - Steady: copper, lead, parts, and cables for 100 tons - Peak: 1000 tons - Adjacencies (list/distance): - Space size (gsf and/or WxLxH): two rooms for 6m x 20 m x 3 m - Experiment Systems: - Shielding: - Floor load (PSF): 2000g/cm2 - Material handling (cranes, etc.) two cranes - Finishes (walls/floor/ceiling): 2000g/cm2 - Casework: - Storage: - Furniture/Fixtures/Equipment (non-experiment): Crane for moving materials in/out - Mechanical: - Environmental conditions: Temperature and humility control, and radon reduced air - Clean class: 10,000 - Ventilation: 100 cfm - Exhaust: 100 cfm - Plumbing (domestic, waste, systems): water supply for assay materials - Fire Suppression: - Building Management System: - Fume hoods: - Chilled water - Other: - Electrical: - Power (clean and dirty): clean - Lighting: - Low Voltage/Data/Communication: - Fire Detection/Alarm: - Other: - Acoustical: - Vibration Isolation: - EMI/RFI Isolation: - Hazardous materials: General waste disposal: 1 hazardous chemical disposal: 1 lead contaminated ppe disposal: OSHA compliant layout - Special Consideration (expansion, etc.):