====== January 13, 2010 Agenda ====== [[:vetoshield|back to meeting page]] ===== Engineering & Organization ===== * Status and schedule of UCSB Soudan Visit. (Joel Sander) * Status of the additional Prop Tubes at Soudan (Jim Beaty) * Where will they go (Discussion) * With the addition of more floor space, should they go on the frame? * Or do we place them on floor (gaps, shadowing, etc) * Status of veto gas system (Joe Pastika) * Status of the DAQ * for Veto Shield (Joe Pastika) * for NMM (Joel Sander) * Data Storage - keep it running and take data for the future. ===== Analysis ===== * Matching time stamps from Veto to NMM (Mark Johnson) * http://www.hep.umn.edu/cdms/cdms_restricted/vetoshield/100112/ * Status of NMM analysis ===== Simulation ===== * Veto Shield MC (Scott Fallows) * http://www.hep.umn.edu/cdms/cdms_restricted/vetoshield/090929/