Agenda for April 15, 2010
Working Group Reports (see jobs below for reference)
Water Shield
Make it real, talk to companies, do the engineering e.g.
Door or labyrinth
Beaver Pixs
Acrylic tunnel costs (Lee reports)
Outer tank engineering
Develop infrastructure into shield (ductwork, electrical etc)
Screener Group
Work with Yuen-Dat to compile results of survey
Define parameters of shielding and common elements between screeners
Plan for screening at Sanford and schedule of installation and move
Immersion Tank
Continue cost and schedule for CTF
compile relevant sections of survey (poll community about the functionality of the ultra sensitive screener
Characterization
short term plans for this summer - involve other groups
long term plans for neutron work