Requirements
Design Criteria
Codes and Standards including EH&S
Shielding material
Structural material
Adaptability for possible remodeled shield configuration or for R&R of equipment
Fabrication-Vendor surface shops and/or 4850 level fabrication
Material transport-Dependant on final Yates lift configuration
Assembly integration
Maintenance
Liquid Processing