Go to the U of M home page
School of Physics & Astronomy
Assay and Acquisition of Radiopure Materials

User Tools


aaac:feb18

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
aaac:feb18 [2015/02/17 21:41] priscaaaac:feb18 [2015/02/17 23:55] (current) prisca
Line 5: Line 5:
  
 === Draft Questions for the AAS/AIP survey === === Draft Questions for the AAS/AIP survey ===
 +  * {{:aaac:aas_prop_pressure_survey_v1.pdf|First Draft of Survey}} James Lowenthal
 === AAAC March Report === === AAAC March Report ===
   *  {{:aaac:proposalpressuremain.pdf|Draft Text}} for the Demographics Section of the AAAC 2015 March report   *  {{:aaac:proposalpressuremain.pdf|Draft Text}} for the Demographics Section of the AAAC 2015 March report
-  * {{:aaac:reportdraft2.pdf|Appendix Information}} for the Report. +  *  {{:aaac:aaac_appendix.pdf|Appendix Information}} for the Report. 
  
 === Schedule next meeting ===  === Schedule next meeting === 
 N.B. The next AAAC teleconference is Friday, February 27 starting at noon Eastern.\\ N.B. The next AAAC teleconference is Friday, February 27 starting at noon Eastern.\\
 The AAAC Report is due March 15. The AAAC Report is due March 15.
aaac/feb18.1424230865.txt.gz · Last modified: 2015/02/17 21:41 by prisca