Line 2: | Line 2: | ||
This is a very loose estimate for the entire facility. | This is a very loose estimate for the entire facility. | ||
- | We will start with {{: | + | We will start with {{: |
+ | * N.B. when the budget went it, the 4100 level was at $3M, not at the $2M listed in this pdf file. | ||
+ | |||
+ | Look closely at this and make comments right here in the wiki. What is missing from the estimate? | ||
+ | |||
+ | Here are a few further comments about the OMB budget: | ||
+ | |||
+ | * Advanced beta & alpha screening, and radon emanation, both R&D development and initial instruments, | ||
+ | |||
+ | * R&D study of advanced techniques for various prototypes (liquid scintillators, | ||
+ | |||
+ | * clean machine shop with special tools such as EDM, laser welders, ... (maybe some of this was in the electroforming), | ||
+ | |||
+ | * Radon suppressed air was assumed to be in facilities infrastructure and DUSEL R&D | ||