Line 2: Line 2:
 This is a very loose estimate for the entire facility.  Our S4 is supposed to get the correct number, but for planning purposes, we need to try for something here. This is a very loose estimate for the entire facility.  Our S4 is supposed to get the correct number, but for planning purposes, we need to try for something here.
  
-We will start with {{:omb_budget.pdf|Kevin Lesko's OMB budget}} N.B. when the budget went it, the 4100 level was at $3M, not at the $2M listed in this pdf file.+We will start with {{:omb_budget.pdf|Kevin Lesko's OMB budget}}  
 +  * N.B. when the budget went it, the 4100 level was at $3M, not at the $2M listed in this pdf file. 
 + 
 +Look closely at this and make comments right here in the wiki.  What is missing from the estimate?  What seems too low or too high? 
 + 
 +Here are a few further comments about the OMB budget: 
 + 
 +  * Advanced beta & alpha screening, and radon emanation, both R&D development and initial instruments, $2M 
 + 
 +  * R&D study of advanced techniques for various prototypes (liquid scintillators, neutrons, ....) , $1M - $2M 
 + 
 +  * clean machine shop with special tools such as EDM, laser welders, ... (maybe some of this was in the electroforming), $1M -$ 2M 
 + 
 +  * Radon suppressed air was assumed to be in facilities infrastructure and DUSEL R&D
  