Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
engineering:apr15_14 [2014/04/15 11:18] – prisca | engineering:apr15_14 [2014/04/15 11:24] (current) – prisca | ||
---|---|---|---|
Line 6: | Line 6: | ||
To summarize: | To summarize: | ||
- | | + | === 1. Those who are authors on " |
- | + | ||
- | * A. Anthony will be reading it today. | + | |
- | + | ||
- | * B. Tony will shorten the Borexino section and add some sentences to the bottom of the Section II conclusions which clearly explain how data matches better to simulations now and why - at the beginning of section III, he will will explain why FLUKA works well (referring back to the previous section) and what changes there HAVE been over the last 4 years. | + | |
- | + | ||
- | * C. Angie and her student will start writing conclusions and the table and plots for the depth and technology section. | + | |
- | + | ||
- | * D. Sarah and Allison need to run the neutron yield sim using the distribution of muons sent by Angie. | + | |
- | + | ||
- | * E. Relative to D, the histograms sent by Angie are from Matlab, which gives each edge of the histogram. | + | |
- | Knowing this Toni and Sarah can simply omit every other set of input numbers. | + | |
- | + | ||
- | * 2. We will put our LRT2013 proceedings on the archive - you need to think what category they go in and they will not necessarily all be submitted to the same place. | + | |
- | + | ||
- | * 3. We need to think about the next AARM collaboration meeting. | + | |
- | Some suggestions: | + | |
- | + | ||
- | * 4. All PI's need to check with their budget people and find out what is left in their AARM budget as well as what is encumbered through September 30 when the grant ends. We need to know how much is left for another AARM meeting. | + | |
- | + | ||
- | * 5. We need to put in another proposal. | + | |
+ | * A. Anthony will be reading it today. | ||
+ | * B. Tony will shorten the Borexino section and add some sentences to the bottom of the Section II conclusions which clearly explain how data matches better to simulations now and why - at the beginning of section III, he will will explain why FLUKA works well (referring back to the previous section) and what changes there HAVE been over the last 4 years. | ||
+ | * C. Angie and her student will start writing conclusions and the table and plots for the depth and technology section. | ||
+ | * D. Sarah and Allison need to run the neutron yield sim using the distribution of muons sent by Angie. | ||
+ | * E. Relative to D, the histograms sent by Angie are from Matlab, which gives each edge of the histogram. | ||
+ | === 2. We will put our LRT2013 proceedings on the archive - you need to think what category they go in and they will not necessarily all be submitted to the same place.=== | ||
+ | === 3. We need to think about the next AARM collaboration meeting. === | ||
+ | If we can get a no-cost extension, we all prefer a date in November (not August of this year!) Some suggestions: | ||
+ | === 4. All PI's need to check with their budget people and find out what is left in their AARM budget as well as what is encumbered through September 30 when the grant ends. We need to know how much is left for another AARM meeting.=== | ||
+ | === 5. We need to put in another proposal. |