Go to the U of M home page
School of Physics & Astronomy
Assay and Acquisition of Radiopure Materials

User Tools


engineering:feb10_12

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
engineering:feb10_12 [2012/02/10 09:54] – created priscaengineering:feb10_12 [2012/02/10 12:54] (current) prisca
Line 1: Line 1:
 ====Agenda ==== ====Agenda ====
 === meeting time === === meeting time ===
-go to doodle page+Based on the doodle page
 [[http://doodle.com/tqep5hcpx8xxq9gt]] [[http://doodle.com/tqep5hcpx8xxq9gt]]
 +we have decided to meet Tuesdays at 2 pm central for sim issues and Friday at 10 central for engineering issues.
 +
 === Collab date === === Collab date ===
   * Mar 23/24   * Mar 23/24
   * Apr 6/7   * Apr 6/7
   * Apr 20/21   * Apr 20/21
--------------- +-------------- DongMing cannot make any of the times between the dotted lines 
->> Apr 25/26 +  Apr 25/26 
->> May 4/5 +  May 4/5 
->> May 11/12 +  May 11/12 
->> --------------------- +  * May 18/19
-  *  May 18/19+
   * May 25/26   * May 25/26
   * Jun 1/2   * Jun 1/2
 +----------------
 +  * Jun 8/9
 +
 +We have tentatively decided on June 8/9 for a large symposium-like AARM collab meeting.
 +Maybe it will either start Thursday and/or take all of Saturday.  People should atively find out if there are unexpected conflicts here.
  
 +=== Proposals ===
 +  * MRI for GeMPI detectors is already in
 +  * MRI for Radon Scrubbing is already in
 +  * Main AARM follow on is Sim and Materials DB 
 +  * Homestake Dark Matter Collab for G3 has yet to figure out what they will ask for
 +  * FAARM will either be a hybrid engineering design and in specific sites (Soudan and Homestake)
 +  * OR possibly only Homestake if Kevin Lesko finds money for a dedicated site
 +  * Production screening at Homestake is an idea of Kevin's for use in refurbished space
 +  * USD (and others?) will put in for a neutron measurement at the 4850 level device (with Gd-loaded water, etc)
 +  * UM, Syracuse (and others?) will put in for a neutron benchmarking at 2100 Soudan (with Gd-loaded water, etc)
 +  * The two above proposals will be separate, but acknowledge each other and work together to share data if both are funded.
engineering/feb10_12.1328889266.txt.gz · Last modified: 2012/02/10 09:54 by prisca