Go to the U of M home page
School of Physics & Astronomy
Assay and Acquisition of Radiopure Materials

User Tools


engineering:feb3_15

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
engineering:feb3_15 [2015/02/03 09:10] mfrittsengineering:feb3_15 [2015/02/03 15:09] (current) mfritts
Line 4: Line 4:
   * Inserting parts of the [[http://arxiv.org/abs/1311.3311|White Paper]] directly into the website   * Inserting parts of the [[http://arxiv.org/abs/1311.3311|White Paper]] directly into the website
   * Details of the May meeting (Richard Schnee)   * Details of the May meeting (Richard Schnee)
-  * Possible organizational meeting at LRT to work on cooperation models, perhaps a dinner meeting (would have to be after a talk on Cooperative Plans (aka AARM) - is this scheduled?). The LRT scientific planning is at 10-11 - so, maybe we should start at 11 am central. (John Orrell)+  * Possible organizational meeting at LRT to work on cooperation models, perhaps a dinner meeting (would have to be after a talk on Cooperative Plans (aka AARM) - is this scheduled?). (John Orrell) 
 +   
 +=== minutes ===
  
 +attending: Matt Fritts, Allison Kennedy, Anthony Villano, Ray Bunker, Jodi Cooley, Richard Schnee, Dongming Mei
  
 +Beginning to make website automatic: entering detector info changes tables on site (test stage)
 +
 +Discussed transferring assay info from white paper to website: worth it? probably, not that much work, convenient place to learn basics of various assay techniques
 +
 +May meeting: AARM meeting May 20 (Wed) afternoon and all day May 21, $75 registration. (This would be after plenary DM etc talks earlier on Wednesday.) Action item: to organize this
 +
 +11 am for weekly meetings is OK for everyone in attendance (in an email Prisca mentioned a 10-11 LRT scientific planning meeting - is this every week?)
  
engineering/feb3_15.1422976228.txt.gz · Last modified: 2015/02/03 09:10 by mfritts