Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| engineering:jan21_10 [2010/01/21 09:08] – leepetersen | engineering:jan21_10 [2010/01/21 09:39] (current) – prisca | ||
|---|---|---|---|
| Line 15: | Line 15: | ||
| * Lee will talk to Dufrane. Need a very rough cost per area coverage for water shield | * Lee will talk to Dufrane. Need a very rough cost per area coverage for water shield | ||
| * New Drawings need to go to DUSEL by Jan 29 - in time for review by larger collaboration for Feb 4 teleconf | * New Drawings need to go to DUSEL by Jan 29 - in time for review by larger collaboration for Feb 4 teleconf | ||
| - | * Prisca gone next week - Lee leads teleconference | + | |
| ==== Discussion for this week ==== | ==== Discussion for this week ==== | ||