January 21 Agenda
Summary of Last Week's Discussion
Accept DongMing's Report - Go with 2.3 m of water thickness in shield
Radiopurity of Acrylic and Stainless are similar (input to thickness decision)
Immersion Tank goes in far corner
Lower water shield down to tank (cost driver)
Top loading from above water shield (removable veto shield)
OR Side Loading - needs engineering concept
Nitrogen blanket becomes load lock mechanism either way
Crane is above water shield and helps with veto shield construction and transport
Lee will talk to Dufrane. Need a very rough cost per area coverage for water shield
New Drawings need to go to DUSEL by Jan 29 - in time for review by larger collaboration for Feb 4 teleconf
Prisca gone next week - Lee leads teleconference
Discussion for this week
Summarize Lee and Bob's discussion wrt transfer of infrastructure into DUSEL format.
Revisit concept drawings - what is still missing, what needs to be changed