Line 1: | Line 1: | ||
- | * Collaboration Meeting - March 19-20 (Tina Lorsung join us for 10 min) | + | ====== Agenda and Minutes (added in italics) ====== |
+ | * Collaboration Meeting - March 19-20 (Tina Lorsung join us for 10 min) | ||
+ | //Tina will contact Melissa and work out details. Other sources of travel funding will also be explored. Reimbursement rules need to be checked.// | ||
* Reporting and Tracking | * Reporting and Tracking | ||
* Go over new WBS - Quarterly Report will use this | * Go over new WBS - Quarterly Report will use this | ||
* Need people to track their work and send me reports every 3 months (next one is March) | * Need people to track their work and send me reports every 3 months (next one is March) | ||
+ | //This will require adding 3rd and 4th level to the current WBS for each element. | ||
+ | I will contact individuals about their detailed WBS for each element.// | ||
* Transferring our info to DUSEL format (" | * Transferring our info to DUSEL format (" | ||
* WBS dictionary | * WBS dictionary | ||
+ | //more details will be added as per above// | ||
* Other docs needed | * Other docs needed | ||
* [[deliverables|Near Term Deliverables]] | * [[deliverables|Near Term Deliverables]] | ||
+ | //The plan for staged deployment will be drafted by Prisca and sent for comments, then uploaded onto docushare. | ||
+ | to transfer infrastructure from wiki to docushare. | ||
* Priority Design Items | * Priority Design Items | ||
* Immersion Tank | * Immersion Tank | ||
Line 12: | Line 19: | ||
* utilizing non-dedicated water shield | * utilizing non-dedicated water shield | ||
* What are the high priority questions we can answer with calculations/ | * What are the high priority questions we can answer with calculations/ | ||
+ | //This has always been the hardest to design. | ||
* Water Shield | * Water Shield | ||
* Size (shrink it?) | * Size (shrink it?) | ||
Line 18: | Line 26: | ||
* Segmentation | * Segmentation | ||
* What are the high priority questions we can answer with calculations/ | * What are the high priority questions we can answer with calculations/ | ||
+ | //DongMing will create a summary paper using simulation work already done, to quantify the thickness of the water layer required for various structural support radiopurity levels. | ||